posted on 2023-03-23, 18:15authored byBernard McCarthy, Ben Gawne, Shaun Meredith
"August 2004".
Project Number: Monitoring and mapping the Euston Weir drawdown trial - M/BUS/5; MDBC Strategic Investigation Program - Rivers - Project R2131.
MDFRC item.
This individual Research Report has an additional 9 Research Reports, see project (Monitoring and mapping the Euston Weir drawdown trial).
The objectives of this Research Report are to: 1. Detail the hydrologic and hydraulic conditions throughout the Mallee Tract over the study period. 2. To characterise some of the physical effects of weirs, partly through a comparison of weir pools and free-flowing reaches in the Mallee Tract.
Open Access. This report has been reproduce with the publishers permission. Permission to reproduce this report must be sought from the publisher. Copyright (2004) Murray-Darling Freshwater Research Centre.